This week we have looked to make a start on our winter work, amongst other jobs we are going to be levelling off a few off the most undulating tees. We started on the 4th medal tee. The turf was lifted, the surface was then rotivated and we added a few loads of sand to lighten up the rootzone mix. We then levelled the tee off, put the wacker plate across, gave the tee a final level off and finally the turf was then relaid. Please stay off this tee as it needs time to bed in.
No comments:
Post a Comment