The Tees have dried out enough over the weekend to get the root zone on. We got root zone on all new tees except the new set @ 5 & 16, we will hopefully tie them in tomorrow. The material gets loaded on with dumpers and then level out by the 360. We have a guy dipping for depths to make sure it's going on at the right depth. We then have a bunker rake working on top to give final levels before turfing.
No comments:
Post a Comment