Tuesday 27 October 2015

Winter work

This week we have looked to make a start on our winter work, amongst other jobs we are going to be levelling off a few off the most undulating tees.  We started on the 4th medal tee.  The turf was lifted, the surface was then rotivated and we added a few loads of sand to lighten up the rootzone mix.  We then levelled the tee off, put the wacker plate across, gave the tee a final level off and finally the turf was then relaid.  Please stay off this tee as it needs time to bed in.



No comments:

Post a Comment